Accomplishments & Next Steps

Project Accomplishments & Financial Summary:

  • Total Donations From 2012 to June 2023: $2,310,661.58
  • Total Qarz Hassanah Received: $1,403,257.07 (To be repaid)
  • Construction Loan: $1,266,085.45 (To be repaid)
  • Total Expenses From 2012 to June 2023: $4,980,004.10
    • $4,575,404.10 in expenses for: Land purchase, building design, site development, county submission fees, taxes, insurance and fundraising expenses, contractor/construction costs
    • $404,600 in expenses for posting bonds- refundable
  • May 2019: Groundbreaking Ceremony
  • May 2019: Brick Campaign Kickoff
    • A total of 54,000 bricks (~$2.6 million) required to complete the construction of the Funeral Facility.
    • Each brick costs $48 (includes construction costs).
    • For donations of $2,500 and higher, a plaque in the donor’s name will be placed inside the facility wall.
  • January 2019 – December 2019: Total Donations Received: $505,599.47
  • January 2020 – December 2020: Total Donations Received: $166,709.00
  • January 2021 – December 2021: Total Donations Received: $202,541.43
  • January 2022 – December 2022: Total Donations Received:  $103,538.98
  • January 2023 – June 2023: Total Donations Received:  $101,272.67
  • Grand Total Donations from January 2019 – June 2023:  $1,079,661.55/$48 which equals approx. 22,492 Bricks
  • 2023: Construction is in progress and scheduled to complete by Summer 2023, In sha Allah.

Mustafa Center Funeral Facility Donations 2019-2023:
Brick Campaign

DescriptionDonation Amount
TOTAL DONATIONS 2019$505,599.47
TOTAL DONATIONS 2020$166,709.00
TOTAL DONATIONS 2021$202,541.43
TOTAL DONATIONS 2022$103,538.98
TOTAL DONATIONS JAN-JUNE 2023$101,272.67
GRAND TOTAL DONATIONS JAN 2019 - JUNE 2023$1,079,661.55
TOTAL BRICKS ($48 = 1 Brick)$1,079,661.55/$48 = 22,492 Bricks

Goal: 54,000 Bricks
Current Brick Count: 22,492

54000 Bricks
22492 Bricks

Project Development Phases & Status:

 

1. Planning – Complete & Approved
a) Special Exception Application Process- Complete & Approved

2. Design Development- Complete & Approved
a) Site Plan – Approved; All site permits have been obtained.
b) Building Plan Design– Complete
c) Building Review – Complete
d) Select Developer – Complete
e) Obtain permit once a developer is selected – Complete

3. Bonds & Fairfax County Fees– Complete; Bonds have been posted
a) Approximately $407,060 (as of 2019) was required to begin the construction permit process. – Complete, fees/bonds posted
b) Once the developer is selected the bonds and fees can be posted. – Complete
Bonds:
I. Surety Construction Bond-Paid
II. Conservation Agreement- Paid
III. VDOT Surety Bond- Paid
Fairfax County Fees- Paid
I. Pro Rata Share Agreement- Paid
II. Permit application fee- Paid
III. Inspection fee- Paid
IV. Misc.

4. Permitting – Complete
a) Demolition Permit- Obtained
b) Building Permit- Obtained
c) Site Land Disturbance Permit- Obtained
d) Storm Water Permit – Obtained
e) VDOT Permit – Obtained

5. Preconstruction Meeting – Scheduled week of April 22, 2019 – Complete

6. Construction & Inspection – In Progress

7. Final Safety Inspection & Occupancy- Commences after Step 6 is complete; Obtain Occupancy Permit.

Our Appeal for Support

We passionately call upon our supporters to generously contribute to this important cause. Every dollar that you spend on this project will be considered a continuous reward (Sadaqah Jariah) to you and your family.  As we all wish to live a dignified life in this world, let’s prepare for a dignified death in our final journey toward our Lord, Allah The Almighty.

Please consider donating at https://mustafacenter.org/donate  or by sending a check payable to Mustafa Center,  6844 Braddock Road, Annandale VA 22003.  (Memo: MC Funeral Facility Donation)

Raise awareness and spread the message in your local communities

Organize a joint fundraising event with Mustafa Center

Have a fundraiser during Jummah Prayer

Apply for grants

Organize an Online fundraiser

Please consider donating online at https://mustafacenter.org/donate  or by sending a check payable to Mustafa Center,  6844 Braddock Road, Annandale VA 22003.  (Memo: MC Funeral Facility Donation)